On May 9, Dali prefecture, yunnan province, held a press conference, Dali prefecture, according to environmental protection bureau chief DJ dee full implementation of erhai lake protection governance sewage pollution engineering to speed up action. As of April 30, with a total investment of 19.9 billion yuan of 110 projects "much starker choices-and graver consequences-in planning, there are three projects to complete the principal part of the project construction, there are 65 projects are to advance, the rest of the project is to carry out the prophase work, has been completed, with the total investment of 5.634 billion yuan, accounting for 28.25% of the planning a total investment of 19.9 billion yuan.
"Make sure that the total decontamination is achieved by the end of June 2018." On April 5, li jinsong said that the project of the first phase of the project of lake erhai lake, which was held in Dali, was held on April 5. On April 7, the "seven major actions" of the "seven actions" of erhai, which was held on April 7th, will accelerate the acceleration of the "seven ACTS" of pollution control and pollution control, which will clarify the target of the 8 key pollution control projects in 2017.
Learned, in villages and towns "two dirty" governance, build the rural passenger things to deal with workplace, rural primary and secondary schools and kindergartens, authorities, 104 enterprises and institutions sewage treatment facilities, built 18770 farmers septic tank, ecological pond, 140, 21 new village sewage treatment facilities has been in the construction, is expected this year on May 31 to complete equipment installation and debugging and production run.
At the same time, the ecological channel is 187.2 km, and the non-coal mountain vegetation restoration is 28,000 square meters. At the end of the year, there were 106 irrigation and water intake for irrigation in the underground Wells of jian-shan district, and 1354 cans of sewage were collected. To clean up the river estuary and erhai exposed beaches, mud, dead water, water gourd, etc. The organization launched 67.97 million people to participate in the "three clean" activities, collecting 94,000 tons of garbage, 7456 tons of silt and 5.06 million tons of livestock and poultry.
In terms of the amount of pollution reduction in the face source, li jinsong said that 2.73 million mu of land circulation was measured in the core area of erhai basin and the surrounding area, which had been circulated 2.34 million mu. A total of 1.38m mu was constructed from the construction of ecological planting, and 800 of the monitoring sites were investigated in the erhai basin. Complete the drip irrigation facility to install 500 mu, the construction of the ecological cutting gap 18.4 km. Complete the planting of 50,000 papaya trees within 50 meters of yongan river.
According to li jinsong, in the operation of water conservation and water conservation ecological restoration, the ecological channel was 187.2 km, and the non-coal mountain vegetation restoration of 28,000 square meters. A new round of "three full astern" engineering construction, complete the returning farmland to forest of 1831 mu, olive experimental base of 2000 mu and China nutrition bags of seedlings of 1768 mu, aquaculture ponds to repel and 1030 mu, the pond is 700 mu of wet. The sea food in erhai waters was planted with 30.18 million plants, 90,000 plants, 12.6 tons of bitter grass and 15 tons of black algae, covering a total area of 20 square kilometers.
According to statistics, to do a good job in publicity work, create a good atmosphere, Dali prefecture in the "seven" into the office, in the villages and towns, into the enterprise, into the school, into the barracks, 92 games into the community, into the schiscosomiasis series activities; Propaganda and mobilization activities over 15500, issued a series of public service ads (picture) of article 11100, article posted signs 32000 (block), food and beverage inn sign 2000, farmers GongShiPai 41100 piece, posters, leaflets, brochures, 550000, protection organization to erhai lake seven "action" as the theme of literature and art show more than 160 times.
Contact: 徐总
Phone: 13769819168
Tel: 0871-68326967,0871-68332989 ,0871-68310606
Email: ynxingxian@126.com
Add: 云南省昆明市高新区活力空间306,404室